Engineers available UK-wide today
Case studies · UK projects

Real projects, real evidence.

A growing catalogue of BWS project case studies across commercial, healthcare, education and data centre sectors — from BG29 pre-commission cleans through to multi-year compliance programmes.

Featured project

Selected work.

Cold water storage tank cleaning at The Stage, Shoreditch
Mixed-use · Shoreditch, London · 2024

The Stage, Shoreditch — validation, pre-commission cleaning, disinfection & commissioning

Building 7 of the Shoreditch regeneration around Shakespeare's Curtain Theatre. Basebuild validation that found SRBs in the heating system, BG29 cleaning and eradication, CWST cleaning & BS8558 disinfection, and AHU commissioning at 106% of design — for MALA Engineering.

Read case study→
The Work Project workspace at One Leadenhall, City of London — arrival lobby
Commercial workspace · City of London · 2025

One Leadenhall, The Work — pre-commission cleaning, disinfection & commissioning

A premium flexible-workspace fit-out across Levels 22 & 23 of a City of London tower. BG29 cleaning of four CHW & LTHW closed systems, closed-system remediation back to BG50 targets, BS8558 disinfection, and water & ventilation commissioning — full evidence pack at handover.

Read case study→
3 Chamberlain Square, Birmingham
Commercial · Birmingham · 2024–25

3 Chamberlain Square — pre-commission cleaning, disinfection & commissioning

189,000 sq ft Grade A office development on Birmingham's Paradise estate. BG29 pre-commission cleaning, BS8558 chlorination, CIBSE Code W water commissioning and CIBSE Code A ventilation commissioning, with full evidence pack at handover.

Read case study→
University of Gloucestershire City Campus — exterior of the redeveloped former Debenhams building on Kings Square, Gloucester
Education · Gloucester · 2024–25

University of Gloucestershire City Campus — commissioning & water treatment

Three zones, five floors. BG29 pre-commission cleaning, BS8558 disinfection of the domestic water (including CWST cleans), water and ventilation commissioning, and BS7592 Legionella verification sampling at handover.

Read case study→
275 sites · 7,800+ assets
Public Sector · Local authority · Ongoing

UK local authority — estate-wide Legionella & water hygiene

275 sites and 7,800+ assets under one ACOP L8 programme — 3,845 TMV services, 1,100+ engineer visits per year, schools, group homes, depots, community buildings, all under one accountable senior engineer. Client confidential.

Read case study→
Brandon Mental Health Primary Care Centre, Leicester — exterior
Healthcare · Leicester · 2024

Brandon Mental Health Centre — HTM-compliant commissioning & water treatment

New NHS mental health primary care facility. BG29 pre-commission cleaning, BS8558 disinfection, LTHW & DHW commissioning, ventilation commissioning to HTM 03-01, plus independent commissioning management to CIBSE Code M.

Read case study→
Speak to the team

Got a project for us?

Send us your brief — site, scope, programme. A senior engineer reviews every enquiry personally and comes back within 48 hours.